Global shift/scale adjustment
Posted: Wed Jul 12, 2023 3:37 am
Hello,
I was hoping it would be possible to as a stop gap measure add the ability to override the import so it always uses the previous input without flashing up the warning "Warning: previously used shift and/or scale don't seem adapted to this entity". This slows down the import process when dealing with point clouds that span a large area. Would it be beneficial to run the global shift/scale adjustment at the end of importing all your files so that the global shift used it optimized for all of the files not just the first file loaded in?
kind regards,
Andrew
I was hoping it would be possible to as a stop gap measure add the ability to override the import so it always uses the previous input without flashing up the warning "Warning: previously used shift and/or scale don't seem adapted to this entity". This slows down the import process when dealing with point clouds that span a large area. Would it be beneficial to run the global shift/scale adjustment at the end of importing all your files so that the global shift used it optimized for all of the files not just the first file loaded in?
kind regards,
Andrew